This was a busy week for the trades. The painters are finishing the trim after finishing the wall colors. The framers started on the garage and the trusses were delivered. The deck framing was started and if all went well, the concrete for below the deck and garage floor should have been poured on the 10th. The hardwood flooring was delivered and is ready to install as soon as the trim is finished.
The sheet vinyl should be installed and the plumber should be setting fixtures in the coming week. Along with the roof on the garage, siding, and the deck and stairs should be finalized.
The kitchen cabinets are in the stain stage and will be installed as soon as the the flooring is down.
July 8, 2009
DSC04851.JPG
DSC04853.JPG
DSC04859.JPG
Trusses being delivered for the MG garage
Dave and the electrician laying out the electrical for the MG garage
Looking from the MG garage to the main house
DSC04863.JPG
DSC04868.JPG
DSC04854.JPG
The HVAC system almost finished.
The hardwood flooring ready to install.
Laundry room color.... Memory Lane
DSC04867.JPG
DSC04855.JPG
Standing in the dining room corner look to the great room and kitchen (left doorway)
Master bath color... Dusty Trail
July 15-17, 2009
  This box should have been a picture of the hardwood flooring
DSC04874.JPG
DSC04879.JPG
 
The MG garage is now framed, ready for concrete and roofing. Concrete is to be done on Monday, 7/20
The pad under the deck being finished. Once it cures enough, the posts will be set and decking installed.
DSC04883.JPG
DSC04885.JPG
DSC04902.JPG
The sheet vinyl is installed in all of the bathrooms and laundry. Same pattern as we had in Derry.
Dining room fixtures have been installed
First pass at cleaning! It’s amazing how much lighter the house is with clean windows
DSC04904.JPG
DSC04915.JPG
DSC04918.JPG
560 plants to help stabilize the back yard
All planted. Too less than a day and they dug the holes by hand. In a year, it should be all covered.
Another view of the back of the house.
July 21-23, 2009
DSC04922.JPG
DSC04928.JPG
DSC04925.JPG
Mulch for the junipers
A hill full of plants
The MG garage, framed and ready for electrical. We now have shingles (7/24)
DSC04930.JPG
DSC04933.JPG
DSC04940.JPG
The deck is now on the back side of the house.
Quite a construction effort to get the stairs from the deck to pass all of the code requirements.
The main HVAC unit. There is a smaller one next to it to help in zoning some of the areas
DSC04948.JPG
DSC04954.JPG
DSC04955.JPG
The HVAC installers getting the inside of the house wired and plumbed
The external garage (MGs will live here) is now ready for the siding.
The replacement flooring arrived and is much better. The color is the same so we don’t have to pick new stain for the kitchen cabinets!
Updated on: July 24, 2009